Olympus One
Canggu, Bali
$300,000
Price
15-25%
Annual ROI (Est.)
5-7 Years
Payback Period
About the Property
Tucked away in a quiet street just minutes from Bali’s most iconic beach clubs and boutique
cafés, Olympus 1 is a private collection of five luxury smart villas, all now fully sold out.
Each villa was designed with investment performance and tropical living in mind:
● 2 bedrooms, 2 bathrooms, and open-plan interiors with floor-to-ceiling glass
● Private pool, sun deck, and lush gardens for total privacy
● indoor elegance with outdoor flow
● High-end furnishings and smart-home integration for turnkey rental readiness
● Fully managed short-let setup, ensuring immediate income for owners
Situated in the heart of North Canggu, Olympus 1 is just:
● 10 minutes to Canggu Beach
● 5 minutes to cafes and nightlife
● 1 minute walk to a premium gym
● Surrounded by 50+ restaurants, wellness studios, and co-working spaces
Location & Nearby Amenities


Backyard Pool

Back Facade

Backyard Pool From Outside

Spaacious Kitchen

Beautifull Living Room

Interior Overview
Development Overview
Follow our construction timeline and key milestones from start to finish.
May 31, 2025
Site Preparation & Early Foundation
Land clearing, leveling, worker housing, electrical setup, and excavation for foundations. Delays noted due to rain and boundary wall dispute (being resolved).
July 5, 2025
Foundation & Structural Columns
Bore pile reinforcement, concrete casting, footplate prep, and rebar work for sloofs and floor slabs.
September 30, 2025
Ground Floor & First Floor Build
Concrete casting for ground floor columns, beams, and slabs. First floor structure and internal wall construction begins.
November 30, 2025
Roofing, Pool, and Interior
Roof slab and rebar completion. Swimming pool excavation and concrete casting. Start of plastering, electrical, and plumbing rough-ins.
January 31, 2026
Finishes & Fixtures
Floor tiles, bathroom installation, carpentry, paintwork, interior/exterior textures, and installation of doors, windows, and lighting.
February 28, 2026
Final Touches & Handover
Landscaping, pool finishing, and outdoor paving. AC, water heater, and appliance installation. Final inspections, deep cleaning, and staging for handover. Estimated Completion: March 2026.